Madman in the Galley |
Pulling the Mast.
Construction of a new wheelhouse.
Installation of a rather large number of solar panels.
Installation of a new battery bank and inverter.
and, of course,
Installing and testing our new electric drive system.
All this mess should take us about three months (he said, being wildly overly optimistic) and then we should get to take you folks along on some travels, first around the Chesapeake, then into the Erie Canal system and the Great Lakes and Canada.
This is gonna be a metric craptonne of work (that is, of course, the technical term) but we love making things.
Stay tuned. This is just beginning.
M
Very cool. I look forward to your updates!
ReplyDelete