Translate

Saturday, August 13, 2022

The Process

 It's odd how things repeat themselves.  In 2013 when we started gearing up to build the original Floating Empire, we began acquiring the things we thought we'd need for the boat, slowly filling up a little unused office space in our apartment with sinks, batteries, solar panels. . .all manner of things to go on the new vessel.



A room full of stuff destined for Floating Empire in '13

Now history is repeating itself.  We're gradually acquiring all the things we think we'll need for this new build, so into the storage locker are going tarps and solar panels, solar generators and fiberglass cloth, and a half ton of epoxy resin, house paint, bottom paint, windows. . . 

Ecoflow Lithium Battery system that will be the heart of our new electrical system.

Of course, living aboard, there's no spare room to put stuff. . .there is, of course, our storage locker. . .and the car. . .and the bilge.

All that being said, we can't wait to get this thing under construction.

Seriously, stay tuned.

M

Monday, August 1, 2022

Building Floating Empire II

 

Alright, so it's time

So we've decided to actually bite the bullet and build a new vessel.  We've spent the last month going over and over photos, plans, sketches, and a host of construction videos and we've finally distilled down what we think we want to build.

Floating Empire II--which will tell us her real name eventually-- will be a 24 foot shantyboat, a riverboat designed for thinwater exploring and comfortable living.

Simple designs like this EcoCat shantyboat most appeal to us.

The result will be a barge-hull box on a raft, drawing only about six inches of water and requiring almost nothing to move her.  We hope to begin construction in September and be in the water some six weeks later, weather permitting.

Wish us luck.


M